|
Tunnelelementerne støbes på en fabrik opført til formålet øst for Rødbyhavn på den danske side. Entreprenørerne skal derfor opføre fabrikken, støbe tunnelelementerne, sejle dem ud til tunnelrenden og sænke dem ned under havbunden i den rende, som er gravet i forvejen.
|
|
The immersed tunnel will be approximately 18 km long and comprise 89 large pre-cast concrete elements. The elements will be cast in a factory built for the purpose east of Rødbyhavn on the Danish side. The contractors will therefore build the factory, cast the tunnel elements, sail them to the tunnel trench and immerse them into a tunnel trench under the seabed that will have been dug out in advance. The contractors will then cover the tunnel elements and finish with a layer of rock on top to protect the tunnel.
|
|
Der etwa 18 Kilometer lange Absenktunnel besteht aus 89 großen Tunnelelementen aus Beton. Die Tunnelelemente werden in einer eigens für diesen Zweck errichteten Fabrik östlich von Rødbyhavn in Dänemark gegossen. In den Aufgabenbereich der Bauunternehmen fallen also der Bau der Fabrik, das Gießen der Tunnelelemente, das Schleppen der Elemente zum Tunnelgraben und deren Absenken in den zuvor im Meeresboden ausgehobenen Graben. Außerdem gehört hierzu das Abdecken der Tunnelelemente, auf die abschließend eine Steinschicht als oberste Schutzschicht aufgebracht wird.
|