|
“Before being in a position to develop new means of public transit, we must ensure the maintenance of existing infrastructures. We are therefore making asset maintenance a top priority, which represents a base investment of $10.3 billion by 2020. We would also like to see two projects already underway completed as soon as possible, the Train de l’Est and the Pie-IX RBS, adding another $1 billion. Finally, we believe that in this first stage, it will be possible to extend the metro’s blue line and to add two stations on the orange line at an estimated cost of $1.6 billion, in addition to adding $1.5 billion for the construction of a LRT system on the future Champlain Bridge,” added Michel Leblanc.
|
|
« Avant de pouvoir développer de nouveaux modes de transport en commun, il faut faire l’entretien des infrastructures déjà existantes. Nous mettons donc le maintien des actifs en tête de nos priorités, ce qui représente un investissement de base de 10,3 milliards $ d’ici 2020. Nous souhaitons également voir la réalisation dans les meilleurs délais de deux projets déjà en cours, soit le Train de l’Est et le SRB Pie-IX, ce qui ajoute 1 G$. Finalement, nous croyons que dans une première phase, il est possible de prolonger la ligne bleue du métro et d’ajouter deux stations sur la ligne orange au coût estimé de 1,6 G$, en plus d’ajouter 1,5 G$ pour construire un SLR sur le futur pont Champlain », a ajouté Michel Leblanc.
|