  LKAB Kiruna | Fineweld  
During 2006 - 2008, a DR pellet mill was constructed for the LKAB iron mine in Kiruna, Northern Sweden. The mill has a capacity of 5 million tons, and the total investment was worth circa 700 million euros.
År 2006 - 2008 byggdes en pelletsfabrik till LKAB:s järngruva i Kiruna i norra Sverige. Anläggningen har en kapacitet på 5 miljoner ton och investeringens totalvärde var cirka 700 miljoner euro.
  UPM-Kymmene Pietarsaari...  
Fineweld Ltd delivered the pipelines for the causticizing, evaporation plant, lime kiln and tall oil separation pipelines and pipe bridges. In total, Fineweld supplied 40 kilometers of pipeline as well as 100 tons of steel structures.
Fineweld Ab levererade rörledningar till kausticeringsanläggningen, indunstningsanläggningen, mesaugnen och talloljekokeriet samt rörbryggor. Totalt levererade Fineweld cirka 40 kilometer rörledningar samt 100 ton stålkonstruktioner.
  First Quantum Minerals,...  
Fineweld Ltd delivered the piping installations for the plant and the tailings management facility for the Kevitsa concentrator. The delivery included a total of 120 tons of steel structures, as well as 50 km of pipelines consisting of PE100, carbon steel, stainless steel and rubber backed and ceramic-lined pipes.
Fineweld Ab levererade rörinstallationer för anrikningsverket samt för hanteringen av anrikningssand för koncentratorn i Kevitsa. Leveransen omfattade totalt 120 ton stålkonstruktioner samt 50 km rörledningar bestående av material som PE100, kolstål, rostfritt stål och gummi- och keramikfodrade rör. Bruttoinvesteringen var värt cirka 400 miljoner USD.
  Vapo Haapavesi | Fineweld  
In 2005, a new bio power plant and wood pellet mill were constructed for Vapo Oyj at their Haapavesi site. The project was completed in 2006. The power plant's boiler has an output of 31 MW, and the pellet mill capacity is circa 70 000 tons of pellets.
Vuonna 2005 Vapo Oyj:n Haapaveden toimipisteessä aloitettiin uuden biovoimalaitoksen ja pellettitehtaan rakennusurakka. Projekti valmistui vuonna 2006. Voimalaitoksen kattilan polttoaineteho on 31 MW ja pellettitehtaan kapasiteetti n. 70 000 tonnia pellettiä.
År 2005 påbörjades byggarbetet av ett nytt biokraftverk och en pelletsfabrik för Vapos anläggning i Haapavesi. Projektet blev färdigt år 2006. Kraftverkets panna har en bränsleeffekt på 31 MW och pelletsfabrikes kapacitet är cirka 70 000 ton pellets.