étaiement – -Translation – Keybot Dictionary

Spacer TTN Translation Network TTN TTN Login Deutsch Français Spacer Help
Source Languages Target Languages
Keybot      637 Results   35 Domains
  3 Hits www.kinderkrebs-schweiz.ch  
Étaiement
Shoring
  3 Hits mtis.ch  
Le passage inférieur de l’avenue Lee consiste de deux soulèvements, courbés, des lignes de poutres trapézoïdales enjambant une ouverture de 86,8 m au-dessus de l’autoroute 417 à Ottawa. La structure a été érigée sur l’étaiement provisoire hors-site.
The Port Mann Bridge Highway 1 project was tendered in 2007 as part of the Gateway Program in Vancouver, B.C. The project was part of the B.C. government’s program to upgrade the transportation network in the Vancouver Region in order to ease congestion on Hwy 1. The scope of the project included upgrading approximately 37 kilometres of highway, including the existing bridge crossing of the Fraser River. The project called for doubling the capacity over the river, expanding the five-lane facility to 10 lanes. Port Mann Bridge main span Canron Western Constructors LP live up to the challenges
  www.tcce.gc.ca  
L’énoncé des travaux est ensuite intégré à une ébauche du contrat subséquent entre TPSGC et l’auteur de la proposition, qui peuvent par la suite entamer des négociations sur les modalités du contrat, le prix et la ventilation des coûts, et l’étaiement des prix par l’auteur de la proposition, aux fins de « justification » des coûts au Canada.
The contract award process described in the CFP is also a multi-stage process. First, the pre-qualified proposals are matched with an appropriate testing department within the government, which participates on a voluntary basis. Once a testing department has been identified, PWGSC helps the department and the author of the proposal negotiate a statement of work (SOW). According to the CFP, “[t]he SOW must represent a benefit to Canada.” The SOW is then incorporated into a draft resulting contract between PWGSC and the author of the proposal, which then enter into negotiations regarding the contract terms and conditions, pricing and cost breakdown, and the provision by the author of the proposal of price support to “substantiate” the costs to Canada. If both parties agree on the contents of the contract, it is finalized, and the contract is awarded.
  janusconsulting.de  
Les stores de terrasse offrent de nombreux avantages aux amateurs d'air frais. Grâce à l'étaiement par l'avant, ces systèmes sont très robustes. En présence d'une pente suffisante et équipés d'une toile imperméable, ils servent non seulement de système d'ombragement mais peuvent également servir sans problème d'abri en cas de pluie.
Terrace awnings offer a lot of benefits for fresh air fans. Frontal support makes the systems very stabile. With sufficient incline and fitted with a waterproof cover they not only provide shade but are also ideal for use in the rain.
Le tende per terrazze offrono numerosi vantaggi. Struttura robusta e stabile grazie ai piantoni anteriori; inoltre, con un'inclinazione sufficiente e se dotate di telo impermeabile, non fungono solo da sistema di ombreggiamento, ma potranno essere impiegate senza problemi anche come protezione dalla pioggia.
  www.ordomedic.be  
Le premier est conservé par le médecin généraliste, le deuxième et le troisième restent à disposition dans la MRS pour étaiement de la continuité et de la qualité des soins. Après le décès du patient, le premier dossier sera classé par le médecin généraliste dans ses archives privées.
Het eerste wordt bewaard door de huisarts zelf, het tweede en het derde blijven ter beschikking in het R.V.T. teneinde zowel continuïteit als kwaliteit van de zorg te ondersteunen. Na overlijden van de patiënt zal het eerste dossier door de huisarts privé worden gearchiveerd. Het tweede en het derde dossier zullen worden gearchiveerd in het R.V.T. onder de verantwoordelijkheid van de zogenoemde "aangewezen geneesheer" van het R.V.T.
  2 Hits www.alqaws.org  
Il assure la taille et la finition des parements de bois avec des outils traditionnels (ébauchoir, bisaiguë, herminette). En outre, il maîtrise les techniques d'étaiement de bâtiments anciens et le vieillissement des bois (brou de noix et chaulage).
The workshop masters a rare and complex expertise: timber frame scribing (a UNESCO Intangible Heritage) and marking. It works respecting the original scribing technique: wood species, lead piquage, scribing, traditional assembly of wood, tenons, mortise, dovetail, dowel, etc. It sizes and finishes the wood with traditional tools (chisel, bisaiguë, adze). In addition, it masters strutting techniques for old buildings and wood aging (walnut and lime).
  www.cnkaifurui.com  
STRUCTURES : planchers réticulaires, dalles, structures unidirectionnelles préfabriquées sur place, plaques alvéolaires, planchers précontraints par post-tension, planchers à plaques collaborantes, plancher en pente, plancher à double hauteur, plancher à grands chants avec renfort d’étaiement, plancher à caissons récupérables.
Structures: reticular reinforced concrete, slabs, in situ unidirectional precast, alveolar plates, post-tensioning slabs, slab with decking plates, slabs on slopes, double height slabs, large slabs of reinforced edges shoring, recoverable coffered slabs.
Структуры: кессонные плиты, плиты, армированные в одном направлении, сплошные плиты, плиты заводского изготовления и изготовленные на месте, многопустотные плиты, плиты с последующим натяжением, композитные плиты, наклонные плиты, плиты двойной высоты, плиты с краями большого размера с дополнительным укреплением.
  teletrade.org  
Les agents apprennent ainsi plusieurs techniques : procédures, déploiement et gestion d’un site, étaiement, appareils électroniques de recherches, percement, découpe, sauvetage aux étages, conditionnement du matériel,…  Ils s’exercent en situation réelle sur le champ de décombre de l’unité de Ghlin.
Die Ausbildung SDE 1 umfasst praktische und theoretische Kurse während einer Woche. So lernen die Bediensteten verschiedene Techniken: Verfahren, Einrichtung und Verwaltung eines Geländes, Abstützung, Umgang mit elektronischen Suchgeräten, Bohren, Schneiden, Bergung aus mehrstöckigen Gebäuden, Vorbereitung des Materials, ... Sie üben unter realistischen Bedingungen auf dem Trümmerfeld der Einheit von Ghlin. Die Bediensteten wurden am Ende der Ausbildung bewertet und erhielten vom Föderalen Fachzentrum für zivile Sicherheit (KCCE) eine Bescheinigung über den erfolgreichen Abschluss.
  www.anic.jp  
D’un point de vue technique, le toit partiel est suspendu à la ferme qui le surplombe. Il a d’abord été assemblé au sol puis installé sur des tours d’étaiement temporaires qui ont par la suite été retirées en suivant une procédure complexe.
From a technical standpoint, the roof is suspended from the girder that sits above it. The roof was first assembled on the ground and then installed on shoring towers that were subsequently removed using a complex procedure. The rounded shape of the column members and main girders also required non-standard connections, all of which were designed by the Canam-Structures engineering team.
  www.ortec.co.il  
D’un point de vue technique, le toit est suspendu à la ferme qui le surplombe. Il a d’abord été assemblé au sol puis installé sur des tours d’étaiement temporaires qui ont par la suite été retirées en suivant une procédure complexe.
From a technical standpoint, the roof is suspended from the girder that sits above it. The roof was first assembled on the ground and then installed on shoring towers that were subsequently removed using a complex procedure. The rounded shape of the column members and main girders also required non-standard connections, all of which were designed by the Canam-Structures engineering team.
  www.jogosdemenina.pt  
” Grâce au système de fixation employé par ULMA, flexible et adaptable aux différents projets, il a été possible de corriger une différence dans l’étaiement de la construction de presque 10 cm, mais aussi d’éviter la démolition de la façade originale “, signale Rodrigo Gamero, délégué commercial de l’entreprise.
3,000 lm of Vanguard range polymer concrete ventilated Facade was installed, in color P06. And 1.80 x 0.90 m panels were chosen for the project, a large format that equips the building with an elegant appearance, with the existing tower being transformed into a new sustainable construction. Thanks to ULMA’s installation system, the original Facade did not need to be demolished.
  learn.lease-advice.org  
Notre offre en location est parfois complétée dans certaines régions par la présence de clients loueurs d'échafaudages. Le groupe Altrad propose également à la location une large gamme d'étais, de tours d'étaiement et de systèmes de coffrages.
In some regions, our rental offer may be completed by the presence of scaffolding rental customers. The Altrad group also has a wide range of props, shoring towers and formwork systems available to rent.
  www.tcce-citt.gc.ca  
L’énoncé des travaux est ensuite intégré à une ébauche du contrat subséquent entre TPSGC et l’auteur de la proposition, qui peuvent par la suite entamer des négociations sur les modalités du contrat, le prix et la ventilation des coûts, et l’étaiement des prix par l’auteur de la proposition, aux fins de « justification » des coûts au Canada.
The contract award process described in the CFP is also a multi-stage process. First, the pre-qualified proposals are matched with an appropriate testing department within the government, which participates on a voluntary basis. Once a testing department has been identified, PWGSC helps the department and the author of the proposal negotiate a statement of work (SOW). According to the CFP, “[t]he SOW must represent a benefit to Canada.” The SOW is then incorporated into a draft resulting contract between PWGSC and the author of the proposal, which then enter into negotiations regarding the contract terms and conditions, pricing and cost breakdown, and the provision by the author of the proposal of price support to “substantiate” the costs to Canada. If both parties agree on the contents of the contract, it is finalized, and the contract is awarded.
  2 Hits www.orthodox-nijmegen.nl  
Mortier à base de ciment pré-mélangé, fluide et auto-nivelant, anti-retrait à résistance mécanique très élevée pour l'ancrage et l'étaiement de précision..
Premixed, fluid and self-levelling cement mortar, non-shrinking with very high mechanical strength for accurate anchoring and grouting.
Gebrauchsfertiger, flüssiger und selbstnivellierender Zementmörtel, schrumpffrei und mit sehr hohem mechanischem Widerstand für Verankerungen und Präzisionsvergießungen.
Malta cementizia premiscelata, fluida e autolivellante, antiritiro ad elevatissime resistenze meccaniche per l’ancoraggio e l’inghisaggio di precisione.
  equestro.com  
Installations d’étaiement
Relaciones con Inversionistas
  7 Hits www.amec.es  
Étaiement d'urgence
Extrication
  8 Hits www.publicsafety.gc.ca  
Entretoisement et étaiement
Setting it safely
  2 Hits www.labour.gov.on.ca  
Excavation, système de soutènement de tunnels et étaiement de tranchées
Excavation, tunnel support system and trench shoring
  13 Hits www.datam.de  
Cadre d’étaiement TG60 AR
TG60 AR Shoring Frame
  5 Hits www.military.ie  
En général, aucune entretoise permanente n’est nécessaire et aucun étaiement n’est requis, à moins d’un avis spécifique.
Bottom chords are fabricated with clips to accommodate rollbars if temporary bridging is needed during
  7 Hits www.rigamuz.lv  
Étaiement d'urgence
Extrication
  250 Hits www.nivahost.net  
Tour d'étaiement Space
Fall Protection SpanSet
  8 Hits do-in-italy.com  
Ne nécessite pas d’étaiement
Non è necessario alcun rinforzo aggiuntivo
  266 Hits www.malalaijoya.com  
Étaiement
Decke
  wwwfr.uni.lu  
L’étaiement des politiques linguistiques de l’Université
die Sprachpolitik der Universität zu beraten
  17 Hits alzahidi-tech.com  
Étaiement 24t
EDIFICACIÓN
  www.fondazionemicheletti.eu  
Le fossé plus profond rend nécessaire l’étaiement de l’ancienne tour de défense, ce qui se voit sur la fondation graduée (flèches) dans la percée moderne entre le fossé de ville et la tour de défense.
The foundation of the younger Inner Wall is more than twice as wide (about 2 – 2.3 m), although it was built long before the use of firearms. It is also much deeper and therefore has a deeper and probably wider moat. The deeper moat necessitated the underpinning of the older fortified tower, which can be seen from the stepped foundation (pillar) in the modern breakthrough between the moat and the fortified tower.
Der Kellerraum beim Weinladen liegt genau zwischen den beiden Stadtmauern. Auf der einen Seite steht eine glatte, zwischen den Mauersteinen sorgfältig verputzte Mauer: Die gegen den Stadtgraben gerichtete Vorderfront (Feindseite) der älteren, sog. Burkhardschen Stadtmauer (erbaut um 1080 – 1100). Die andere Seite des Raums wird durch eine rauhe, unverputzte Mauer gebildet: Die Rückseite der jüngeren Inneren Stadtmauer (1200 – 1250). Betritt man diesen „Stadtmauerkeller“ vom Innenhof her, so durchquert man zuerst einen zur älteren Mauer gehörenden rechteckigen Wehrturm. Wenn man hingegen durch den Weinladen eintritt, so erkennt man im Boden das Fundament eines an die jüngere Stadtmauer angebauten halbrunden Turms.