after a period – Chinese Translation – Keybot Dictionary
TTN Translation Network
TTN
TTN
Login
Deutsch
Français
Source Languages
Target Languages
Select
Select
Keybot
57
Results
40
Domains
blogs.transparent.com
Show text
Show cached source
Open source URL
to catch up: to get to the point you should be,
after
a
period
of delay
Compare text pages
Compare HTM pages
Open source URL
Open target URL
Define
blogs.transparent.com
as primary domain
On days off, I like to cook breakfast at home. I can cook an American style breakfast – eggs, bacon, potatoes, bread, and so on.
mice.okinawastory.jp
Show text
Show cached source
Open source URL
When two participants meet, the actor closest to their goal continues walking, while the other must sit or lie on the landscape and rest.
After a period
lasting between 24 and 36 hours, only one remains standing.
Compare text pages
Compare HTM pages
Open source URL
Open target URL
Define
unigine.com
as primary domain
John Gerrard - is an Irish artist, working in Dublin and Vienna, who already made more than 70 installations and art projects, best known for his sculptures, which typically take the form of digital simulations displayed using Real-time computer graphics.
4 Hits
heckmann-mt.de
Show text
Show cached source
Open source URL
Steel structure in use
after a period
of time, the steel structure roofing/workshop roof sheet metal surface (choi steel, sandwich board, etc.) will appear rust corrosion, domestic choi steel usually for 8 to 10 years to whole rust renovation.
Compare text pages
Compare HTM pages
Open source URL
Open target URL
Define
numchucks.com
as primary domain
钢结构在使用一段时间后,钢结构屋面/厂房屋面金属板表面(彩钢板、夹芯板等)便会出现生锈腐蚀,国内的彩钢板通常为8-10年就要整体防锈翻新。这样能有效避免屋面进一步锈蚀老化,恢复应有的使用功能,延长使用寿命。降低能耗,用最低的费用换取因锈蚀、损毁严重而不得不更换屋面板所带来的不便和巨额成本。金属屋面防腐系统使屋面防锈翻新变得简单。 施工程序: 1、检查并清理涂刷区域基面,对需涂装的钢结构屋面要事先进行除 油,清理焊碴、厚锈、浮锈、灰砂。 2、喷涂或刷涂 1 - 2 道防腐蚀底漆,推荐涂层干膜厚度为 70-90 微米,本涂料单涂时最高干膜厚度不得大于 100 微米;需要二次涂覆的屋面,在第一次涂覆 12 小时后可再次涂覆施工,施工中要注意切勿混入油污或有机溶剂。 3、在涂刷表面再刷 1 - 2 道中涂、面涂防腐蚀隔热涂料。可显著提高防腐蚀 能力,同时可起到隔热反光的功效。 4、施工环境:钢构件表面必须干燥,表面高于露点 3 ℃ 以上。施工温度为 5 -40 ℃ 之间,雨雪、大雾天气或有较大灰尘环境不宜施工,相对湿度>85% 的条件下不宜施工;涂层在 24 小时内不能雨淋。 5、工具清洗:在施工过程中必须单独使用涂装器具,在涂料未固化的情况下,用清水即可冲洗干净。