reliability concerns – French Translation – Keybot Dictionary
TTN Translation Network
TTN
TTN
Login
Deutsch
Français
Source Languages
Target Languages
Select
Select
Keybot
31
Results
9
Domains
ottawa.ca
Show text
Show cached source
Open source URL
Reliability concerns
determine the timing for this project. It is needed in the beginning of the 2009 to 2019 time period.
Compare text pages
Compare HTM pages
Open source URL
Open target URL
Define
ottawa.ca
as primary domain
Conduite principale d’eau du chemin Hazeldean (de la station de pompage de Glen Cairn jusqu’au chemin Carp)
10 Hits
scc.lexum.org
Show text
Show cached source
Open source URL
27 In light of the recent jurisprudence of this Court, it is evident that while the rule against admission of involuntary statements was initially based primarily on
reliability concerns
, the law has evolved considerably since that time.
Compare text pages
Compare HTM pages
Open source URL
Open target URL
Define
scc.lexum.org
as primary domain
27 Il ressort de la jurisprudence récente de notre Cour que si la règle de non‑admissibilité des déclarations involontaires était, à l'origine, fondée principalement sur des considérations de fiabilité, le droit en la matière a considérablement évolué depuis. Dans R. c. Whittle, [1994] 2 R.C.S. 914, à la p. 932, la Cour a tiré la conclusion suivante:
10 Hits
csc.lexum.org
Show text
Show cached source
Open source URL
27 In light of the recent jurisprudence of this Court, it is evident that while the rule against admission of involuntary statements was initially based primarily on
reliability concerns
, the law has evolved considerably since that time.
Compare text pages
Compare HTM pages
Open source URL
Open target URL
Define
csc.lexum.org
as primary domain
27 Il ressort de la jurisprudence récente de notre Cour que si la règle de non‑admissibilité des déclarations involontaires était, à l'origine, fondée principalement sur des considérations de fiabilité, le droit en la matière a considérablement évolué depuis. Dans R. c. Whittle, [1994] 2 R.C.S. 914, à la p. 932, la Cour a tiré la conclusion suivante:
www.acoa-apeca.gc.ca
Show text
Show cached source
Open source URL
The proposed transmission projects are being developed to address
reliability concerns
, and do not explicitly address the export constraints between New Brunswick and Maine or between Maine and the rest of New England.
Compare text pages
Compare HTM pages
Open source URL
Open target URL
Define
acoa-apeca.gc.ca
as primary domain
Avec une très grande capacité de production au gaz naturel, le Maine a présentement des contraintes à l’exportation. Ceci a entraîné des prix de l’énergie et des prix liés à la capacité faibles ainsi que des problèmes de fiabilité. Les projets de transmission proposés sont élaborés afin de répondre aux problèmes de fiabilité et ils ne règlent pas expressément les contraintes à l’exportation entre le Nouveau-Brunswick et le Maine ou entre le Maine et le reste de la Nouvelle Angleterre.