estimation du potentiel – English Translation – Keybot Dictionary
TTN Translation Network
TTN
TTN
Login
Deutsch
Français
Source Languages
Target Languages
Select
Select
Keybot
45
Results
30
Domains
www.lauterbach.com
Show text
Show cached source
Open source URL
Estimation du potentiel
d’économie
Compare text pages
Compare HTM pages
Open source URL
Open target URL
Define
zeroemissionsolutions.com
as primary domain
Estimating saving potential
dfo-mpo.gc.ca
Show text
Show cached source
Open source URL
L'
estimation du potentiel
de reproduction ou de remplacement doit toujours être fondée sur la meilleure information disponible, et l'approche retenue doit être la mieux adaptée au stock concerné et aux données disponibles.
Compare text pages
Compare HTM pages
Open source URL
Open target URL
Define
dfo-mpo.gc.ca
as primary domain
Management actions must promote stock growth. Removals from all sources must be kept to the lowest possible level until the stock has cleared the Critical Zone. A rebuilding plan must be in place with the aim of having a high probability of the stock growing out of the Critical zone within a reasonable timeframe12. This plan must be associated with appropriate monitoring and assessment of the condition of the stock to confirm the success of rebuilding. The plan must also include additional restrictions on catches, and a provision that application of the measures is mandatory if the evaluation fails to find clear evidence that rebuilding is occurring.
2 Hits
ipcc.ch
Show text
Show cached source
Open source URL
e) Les catégories exclues sont : les émissions de gaz autres que le CO2 (bâtiments et transports), une partie des options visant le rendement des matériaux, la production de chaleur et la cogénération (approvisionnement énergétique), les véhicules utilitaires lourds, le traffic maritime et les transports de passagers à fort taux d’occupation, la plupart des options coûteuses (bâtiments), le traitement des eaux usées, la réduction des rejets des mines de charbon et des gazoducs, les gaz fluorés (approvisionnement énergétique et transports). La sous-
estimation du potentiel
économique total qui en résulte est de l’ordre de 10 à 15 %.
Compare text pages
Compare HTM pages
Open source URL
Open target URL
Define
ipcc.ch
as primary domain
e) Categories excluded are: non-CO2 emissions in buildings and transport, part of material efficiency options, heat production and co-generation in energy supply, heavy duty vehicles, shipping and high-occupancy passenger transport, most high-cost options for buildings, wastewater treatment, emission reduction from coal mines and gas pipelines, and fluorinated gases from energy supply and transport. The underestimation of the total economic potential from these emissions is of the order of 10 to 15%.
www.omaf.gov.on.ca
Show text
Show cached source
Open source URL
Létude montre que la majeure partie de lénergie pouvant être produite à partir des matières issues de la transformation agro-alimentaire proviendrait des secteurs de la transformation de la viande, de la récupération animale et des céréales et oléagineux. Les déchets de la consommation alimentaire des foyers comptent également pour une part importante dans l
estimation du potentiel
énergétique total.
Compare text pages
Compare HTM pages
Open source URL
Open target URL
Define
omaf.gov.on.ca
as primary domain
The study shows that the bulk of estimated energy available from food and beverage processing materials is from the meat processing, rendering, and grains and oilseeds sectors. Post-consumer plate food wastes also account for a significant share of the estimate of overall energy potential.
www.dfo-mpo.gc.ca
Show text
Show cached source
Open source URL
L'
estimation du potentiel
de reproduction ou de remplacement doit toujours être fondée sur la meilleure information disponible, et l'approche retenue doit être la mieux adaptée au stock concerné et aux données disponibles.
Compare text pages
Compare HTM pages
Open source URL
Open target URL
Define
dfo-mpo.gc.ca
as primary domain
Management actions must promote stock growth. Removals from all sources must be kept to the lowest possible level until the stock has cleared the Critical Zone. A rebuilding plan must be in place with the aim of having a high probability of the stock growing out of the Critical zone within a reasonable timeframe12. This plan must be associated with appropriate monitoring and assessment of the condition of the stock to confirm the success of rebuilding. The plan must also include additional restrictions on catches, and a provision that application of the measures is mandatory if the evaluation fails to find clear evidence that rebuilding is occurring.
2 Hits
www.omafra.gov.on.ca
Show text
Show cached source
Open source URL
Létude montre que la majeure partie de lénergie pouvant être produite à partir des matières issues de la transformation agro-alimentaire proviendrait des secteurs de la transformation de la viande, de la récupération animale et des céréales et oléagineux. Les déchets de la consommation alimentaire des foyers comptent également pour une part importante dans l
estimation du potentiel
énergétique total.
Compare text pages
Compare HTM pages
Open source URL
Open target URL
Define
omafra.gov.on.ca
as primary domain
The study shows that the bulk of estimated energy available from food and beverage processing materials is from the meat processing, rendering, and grains and oilseeds sectors. Post-consumer plate food wastes also account for a significant share of the estimate of overall energy potential.
www.one-neb.gc.ca
Show text
Show cached source
Open source URL
En greffant l'estimation de gaz commercialisable de la formation de Montney à d'autres évaluations faites antérieurement, le potentiel ultime total restant dans l'Ouest canadien atteint 17 898 Gm3 (632 Tpi3). Il est par ailleurs probable que ce volume augmente avec l'
estimation du potentiel
d'autres formations non classiques.
Compare text pages
Compare HTM pages
Open source URL
Open target URL
Define
one-neb.gc.ca
as primary domain
By combining the Montney's marketable gas estimate with prior assessments, the total ultimate potential remaining in Western Canada is 17,898 billion m3 (632 Tcf). This estimate is likely to increase as additional unconventional potential from other formations is estimated.
www.pc.gc.ca
Show text
Show cached source
Open source URL
12 Zins, Beauchesne et Associés, Canal de Lachine:
estimation du potentiel
de marché exclusif de deux concepts de développement et évaluation et analyse du marché récréatif, Rapport final pour Parcs Canada, novembre 1995.
Compare text pages
Compare HTM pages
Open source URL
Open target URL
Define
pc.gc.ca
as primary domain
12 Zins, Beauchesne et Associés, Canal de Lachine: estimation du potentiel de marché exclusif de deux concepts de développement et évaluation et analyse du marché récréatif, Final Report for Parks Canada, November 1995.
www.tobzamer.pl
Show text
Show cached source
Open source URL
En 2007, Quasys créé le Compagnonnage de Talents®. Cet ensemble cohérent de services qui va de l’
estimation du potentiel
d’une personne jusqu’à sa transformation en compétences remarquables.
Compare text pages
Compare HTM pages
Open source URL
Open target URL
Define
quasys.com
as primary domain
The Director of the company Hydrometal said that “goals (after coaching) are achieved with coached more attentive, achieving better reporting, with less absenteeism and better productivity and this after only 3 months” .
canmetenergy.nrcan.gc.ca
Show text
Show cached source
Open source URL
À la section 2 du présent rapport, on indique la nécessité de faire l’évaluation d’un certain nombre de caractéristiques hydrologiques et physiques des passages de canaux sans point de jaugeage afin d’en arriver à une
estimation du potentiel
d’énergie hydrocinétique, c’est-à-dire :
Compare text pages
Compare HTM pages
Open source URL
Open target URL
Define
canmetenergie.rncan.gc.ca
as primary domain
Section 1 provides an introduction and outlines the goals and structure of this study of hydrokinetic potential. The project goals are to ultimately characterize and quantify the hydrokinetic power potential in Canada. Section 2 of this report identifies the need to estimate a number of hydrologic and physical characteristics at ungauged channel reaches to provide an estimate of hydrokinetic energy potential:
2 Hits
www.balesio.com
Show text
Show cached source
Open source URL
Storage Analyzer intégré : Analyse du serveur et
estimation du potentiel
d’optimisation et d’économies
Compare text pages
Compare HTM pages
Open source URL
Open target URL
Define
balesio.com
as primary domain
Scheduler for automated server optimizations: perform the optimization process automatically, for example in the evening or on weekends
www.eawag.ch
Show text
Show cached source
Open source URL
Or son
estimation du potentiel
de la Suisse dans ce domaine est jugé trop optimiste par les spécialistes qui considèrent notamment que les apports de la petite hydraulique sont sans commune mesure avec les impacts environnementaux.
Compare text pages
Compare HTM pages
Open source URL
Open target URL
Define
eawag.ch
as primary domain
Switzerland has decided to phase out nuclear energy. As well as renewable sources, such as photovoltaics, the federal government intends to expand the use of hydropower. According to numerous experts, however, its assumptions regarding the potential for hydropower development are -unrealistic. The benefits of additional small plants, they argue, are limited compared to the ecological damage; at the same time, there is a need for new pumped-storage plants. [...]
filmnapok.kek.org.hu
Show text
Show cached source
Open source URL
2.
Estimation du potentiel
matière, agronomique et énergétique, de l'impact de CO2 et du coût des scénarios
Compare text pages
Compare HTM pages
Open source URL
Open target URL
Define
2ei.veolia.com
as primary domain
Listing of the waste-derived energy potential within a territory (recovered energy)
5 Hits
www.neb.gc.ca
Show text
Show cached source
Open source URL
L’
estimation du potentiel
ultime de gaz naturel non classique du bassin de Horn River dans le nord-est de la Colombie-Britannique a été établie :
Compare text pages
Compare HTM pages
Open source URL
Open target URL
Define
neb.gc.ca
as primary domain
The estimate of the ultimate potential for unconventional natural gas in the Horn River Basin of northeastern B.C. was determined by:
www.efficaciteenergetique.mrnf.gouv.qc.ca
Show text
Show cached source
Open source URL
une
estimation du potentiel
énergétique à l'échelle du Québec;
Compare text pages
Compare HTM pages
Open source URL
Open target URL
Define
efficaciteenergetique.mrnf.gouv.qc.ca
as primary domain
an estimate of the energy potential for Québec
www.antemeta.fr
Show text
Show cached source
Open source URL
Une équipe de recherche du CSTB a travaillé sur l'
estimation du potentiel
de récupération instantanée de chaleur sur eaux grises, grâce à l'installation expérimentale Simulhome, intégrée à la plateforme d'essais Aquasim.
Compare text pages
Compare HTM pages
Open source URL
Open target URL
Define
recherche.cstb.fr
as primary domain
A research team of the CSTB worked on estimating the potential for instant heat recovery from greywater, thanks to the experimental installation Simulhome at the Aquasim test facility. Simulhome reproduces domestic water use realistically, in a standard-equipped housing unit.
2 Hits
www.bfe.admin.ch
Show text
Show cached source
Open source URL
Mesures et modélisations pour une
estimation du potentiel
(pdf, 122 KB)
Compare text pages
Compare HTM pages
Open source URL
Open target URL
Define
bfe.admin.ch
as primary domain
Messen und Modellieren für eine Potenzialabschätzung (pdf, 122 KB)
3 Hits
hc-sc.gc.ca
Show text
Show cached source
Open source URL
Estimation du potentiel
de parvenir à la santé des projets au Fonds des services d'intégration
Compare text pages
Compare HTM pages
Open source URL
Open target URL
Define
hc-sc.gc.ca
as primary domain
Estimated reach of potential Health Services Integration Fund projects
2 Hits
wolf.ifj.edu.pl
Show text
Show cached source
Open source URL
Estimation du potentiel
Compare text pages
Compare HTM pages
Open source URL
Open target URL
Define
topmotors.ch
as primary domain
Estimating the savings potential
3 Hits
www.hc-sc.gc.ca
Show text
Show cached source
Open source URL
Estimation du potentiel
de parvenir à la santé des projets au Fonds des services d'intégration
Compare text pages
Compare HTM pages
Open source URL
Open target URL
Define
hc-sc.gc.ca
as primary domain
Estimated reach of potential Health Services Integration Fund projects
www.montourduqueyras.fr
Show text
Show cached source
Open source URL
l'
estimation du potentiel
de valorisation par l'entreprise;
Compare text pages
Compare HTM pages
Open source URL
Open target URL
Define
gevers.be
as primary domain
Estimation of the valorization potential for the company;
www.nrcan.gc.ca
Show text
Show cached source
Open source URL
Développer une approche axée sur l’analyse du cycle de vie pour l’
estimation du potentiel
de réduction des gaz à effet de serre qu’ont les synergies des sous-produits ou les projets industriels d’écoefficacité.
Compare text pages
Compare HTM pages
Open source URL
Open target URL
Define
rncan.gc.ca
as primary domain
To develop a life-cycle analysis approach for estimating the greenhouse gas savings potential of by-product synergies or industrial eco-efficiency projects.
www.rncan.gc.ca
Show text
Show cached source
Open source URL
Développer une approche axée sur l’analyse du cycle de vie pour l’
estimation du potentiel
de réduction des gaz à effet de serre qu’ont les synergies des sous-produits ou les projets industriels d’écoefficacité.
Compare text pages
Compare HTM pages
Open source URL
Open target URL
Define
rncan.gc.ca
as primary domain
To develop a life-cycle analysis approach for estimating the greenhouse gas savings potential of by-product synergies or industrial eco-efficiency projects.
www.analyzemath.com
Show text
Show cached source
Open source URL
Estimation du potentiel
énergétique marin dans la région de Chypre (2013)
Compare text pages
Compare HTM pages
Open source URL
Open target URL
Define
cea.org.cy
as primary domain
Estimation of the marine energy potential in the region of Cyprus (2013)
2 Hits
ozone.unep.org
Show text
Show cached source
Open source URL
La fourchette se rapporte à un groupe d’isomères. La valeur supérieure correspond à l’
estimation du potentiel
de l’isomère au potentiel le plus élevé et la valeur inférieure à l’
estimation du potentiel
de l’isomère au potentiel le plus faible.
Compare text pages
Compare HTM pages
Open source URL
Open target URL
Define
ozone.unep.org
as primary domain
* Where a range of ODPs is indicated, the highest value in that range shall be used for the purposes of the Protocol. The ODPs listed as a single value have been determined from calculations based on laboratory measurements. Those listed as a range are based on estimates and are less certain. The range pertains to an isomeric group. The upper value is the estimate of the ODP of the isomer with the highest ODP, and the lower value is the estimate of the ODP of the isomer with the lowest ODP.
www.bergara.eus
Show text
Show cached source
Open source URL
Ces simulations permettent également de comprendre comment transformer l’énergie des courants de marée. L’an dernier, le groupe a mené divers travaux, dont l’
estimation du potentiel
électrique des principaux sites marémoteurs de la Nouvelle-Écosse.
Compare text pages
Compare HTM pages
Open source URL
Open target URL
Define
computecanada.ca
as primary domain
This research is focused on completing detailed resource and site analysis for potential in-stream tidal energy sites in Nova Scotia. This analysis includes characterizing the tidal flow, estimating the power that can be extracted from the flow and predicting the resulting impacts on the tides and tidal currents. Compute Canada infrastructure is used to conduct high-resolution numerical simulations of the tides and tidal currents in the Bay of Fundy. These simulations model the tides and tidal currents, and how energy can be extracted from the tidal currents. Last year, some of our research activities included making extractable power estimates for all major Nova Scotia tidal resources. In total, the calculations estimated that the tidal resource could support more than 1400 MW of installed capacity with only a minor impact on the tides. This is 55 per cent of Nova Scotia’s generation capacity. The results of this research could have significant impact Canada’s energy future. The research provides critical support to the establishment of a tidal-energy industry in Nova Scotia and nationally. Such an industry would produce substantial amounts of sustainable, renewable electricity that would reduce Nova Scotia’s production of greenhouse gases and decrease its dependency of foreign fuels. This research would not be possible without Compute Canada’s infrastructure because the numerical simulations require large computer resources not available at Acadia University or elsewhere.