|
Tigné Point, in Malta, is a real estate development of residential, leisure, commercial and retail facilities set in a fully pedestrianized environment on the peninsula of the same name. The Tigné Point contractor appointed A&A Blasting Services Ltd to protect the steel columns and beams of the development’s new 6200m² eleven-floor office building against fire for 120 minutes with fire-resistant plaster. The contractor specified using Monokote MK6/HY with a thickness from 40 to 50mm produced by Grace Fireproofing.
|