zones résidentielles – English Translation – Keybot Dictionary

Spacer TTN Translation Network TTN TTN Login Deutsch Français Spacer Help
Source Languages Target Languages
Keybot 3 Results  readythermobag.com
  Roskilde Fjordforbindel...  
La proximité du chantier avec les zones résidentielles et les accès difficiles par la mer et la route représentent des défis supplémentaires au niveau de la gestion de la logistique, de la poussière, du bruit et du trafic.
An important award criterion was the consideration of the surroundings. The Fjord of Roskilde is designated as a Natura 2000 area, as it is a habitat for sensitive vegetation (eelgrass) and an important refuge for waterfowls. The location of residential areas very near to the construction site and difficult access possibilities for marine and land pose additional challenges with regards to logistics, dust, noise and traffic management.
  Tour Cadiz - BESIX  
BESIX-Vanhout s’est chargé des travaux de finition, des installations techniques dans toutes les zones résidentielles, des infrastructures de parking, des parties communes et même de la conception du jardin d'intérieur.
Standing tall on a former customs area along the canal, the spectacular complex counts as a new landmark within a completely renovated district. Before construction work could begin, the team first needed to carry out soil remediation and dismantle the old customs installations. BESIX-Vanhout also completed the finishing work, technical installations in all residential areas, parking facilities, communal spaces and even the design of the interior garden. Residents of the nursing home moved into their new home in February 2017, while all 48 assisted living spaces have been sold and are set for completion in summer 2017.
  Canal de Dubaï - BESIX  
Le canal traversant des zones résidentielles de haut standing ainsi que certaines des principales artères de la ville, nos équipes n’ont pas lésiné sur les efforts pour minimiser l’impact sur le trafic quotidien et le bien-être des résidents locaux.
The project’s main challenge was the diversion of the underground services in order for the excavation and construction of the 3-km-long canal to proceed smoothly. Cutting through high profile residential areas, as well as some of the city’s main traffic arteries, our teams went to great lengths to minimize the impact on the day-to-day traffic and the wellbeing of the local res-idents. Rethinking old methods, the new deep sewerage system was built using the NDRC method (non-destructive road crossings – directional drilling – micro-tunneling), pushing concrete GRP pipes over distances of over 100 meters, also limiting the impact on the surrounding traffic and neighborhoods. A remarkable strategy, as this method is usually put into practice to cross a single road, highway or railway.