zps – English Translation – Keybot Dictionary

Spacer TTN Translation Network TTN TTN Login Deutsch Français Spacer Help
Source Languages Target Languages
Keybot 2 Results  ottawa.ca
  Section 5.0 - Plan de v...  
Une petite partie de la collectivité de Fernbank se trouve sur des terrains pouvant être considérés comme appartenant à la future zone de pression de Stittsville (ZPS), en raison de l’élévation du sol et du fait qu’une vérification des limites de la future ZPS devrait être faite en tenant compte de l’aménagement de Fernbank.
Water supply to the Fernbank Community will be provided by a 305mm diameter trunk watermain network with sufficient capacity to maintain appropriate pressures and fire flows throughout the development. A small portion of the Fernbank community is located in lands that may be considered to be part of the future Stittsville Pressure Zone (SPZ) based on ground elevation and a review of the boundaries of the future SPZ should be undertaken in consideration of the Fernbank development. Additional firm pumping capacity at the Glen Cairn Pumping Station and one of the Zone 2W pumping stations is required to meet the additional demands associated with the Fernbank Community.
  Section 5.0 - Plan de v...  
Une petite partie de la collectivité de Fernbank se trouve sur des terrains pouvant être considérés comme appartenant à la future zone de pression de Stittsville (ZPS), en raison de l’élévation du sol et du fait qu’une vérification des limites de la future ZPS devrait être faite en tenant compte de l’aménagement de Fernbank.
Water supply to the Fernbank Community will be provided by a 305mm diameter trunk watermain network with sufficient capacity to maintain appropriate pressures and fire flows throughout the development. A small portion of the Fernbank community is located in lands that may be considered to be part of the future Stittsville Pressure Zone (SPZ) based on ground elevation and a review of the boundaries of the future SPZ should be undertaken in consideration of the Fernbank development. Additional firm pumping capacity at the Glen Cairn Pumping Station and one of the Zone 2W pumping stations is required to meet the additional demands associated with the Fernbank Community.