po – Übersetzung – Keybot-Wörterbuch

Spacer TTN Translation Network TTN TTN Login Français English Spacer Help
Ausgangssprachen Zielsprachen
Keybot 11 Ergebnisse  www.nrcan.gc.ca
  Appendix F | Earth Scie...  
Web site: http://www.gagtl.ac.uk
Site Web : http://www.gagtl.ac.uk
  References | Earth Sci...  
Adger, W., Brooks, N., Kelly, M., Bentham, G., Agnew, M., and Eriksen, S., (2004): New indicators of vulnerability and adaptive capacity; Tyndall Centre, Technical Report 7, ac.uk/research/theme3/final_reports/it1_11.pdf>, [accessed February 19, 2007].
Adger, W., N. Brooks, M. Kelly, G. Bentham, M. Agnew et S. Eriksen. New indicators of vulnerability and adaptive capacity, Tyndall Centre, Technical Report 7, 2004, , [consultation : 19 février 2007].
  Audit of Real Property ...  
25 Core Management Controls, Treasury Board of Canada Secretariat, November 2007 (AC-1, RM-7, ST-8 & 10)
25 Contrôle de gestion de base, Secrétariat du Conseil du Trésor du Canada, novembre 2007 (AC-1, RM-7, ST-8 & 10)
  Authorization Guideline...  
The appendices describe in detail the general and specific requirements that must be met by each category of fireworks. The requirements that are critical are identified with the letter AC. @ More stringent acceptance criteria are used for the critical characteristics.
Au cours d’un processus d’autorisation, si on constate rapidement au cours des tests une non conformité de la pièce, on arrêtera les tests et on détruira les échantillons. La demande sera rejetée. On ne cherchera pas à avoir une explication de cette non conformité et les tests ne pourront être repris.