|
Die federführende Landschaftsarchitektin, Ute Hoffmann, Bürogemeinschaft Stadt- und Dorfplanung, beschreibt: „Die Idee zu Karls Klettersilo entstand in unserer Karls-Planungsgruppe aus verschiedenen Ansprüchen. Zum einen wollten wir auch für die älteren Kinder etwas neues Einmaliges anbieten, da wir selbst alle Kinder haben, die mittlerweile teilweise aus den üblichen Kinderspielplätzen „raus gewachsen“ sind.
|
|
Marius Kotte, architect at the Berliner Seilfabrik (Rope Factory) and head of the construction and development department, explicitly names the height of the device as a special challenge: “We had to make sure that it was possible to connect the parts without big measuring tolerances, as the net does not allow much measure deviation. Here, however, it was already the tolerances of the pipe supplier that gave us a headache, as this was already at +- 50mm with the 13m long poles. Due to the length of the posts, a mounting by simply positioning and screwing together was not possible. In addition, this kind of net has never been built before. For the net, connecting details between the tightening ball and the poles had to be developed. The net is hung in a “swimming” position; this means that the upper balls are brought into position by guy ropes. Here, too, a deviation from the system measures was not allowed.”, said Marius Kotte.
|