For example, if as of January 1, 2017, Contractor ABC’s point deduction for Design-Build-Finance RFQs is minus 1.75% (based on having accumulated two infractions in the last 24 months with a further 50% reduction during the 2017 phase in period) and Contractor XYZ does not have any record of infractions (and thus a 0% deduction), and Contractor ABC and XYZ are in a 50/50 joint venture bidding to an RFQ, then for any prequalification submission received up until February 28, 2017 in which Contractor ABC and Contractor XYZ are acting as 50/50 joint venture partners, the total deduction applied to the score of the joint venture will be minus 0.875% of the Construction Team Member Capability and Experience available points, which will be automatically subtracted from that section following the completion of individual and consensus evaluations.
|
|
Par exemple, au 1er janvier 2017, l’entrepreneur ABC fait l’objet d’une déduction de 1,75 % en vertu d’une DQ Conception-Construction-Financement (pour deux infractions cumulées au cours des 24 mois précédents) moins 50 % pour la période de mise en œuvre du Programme en 2017) et l’entrepreneur XYZ, qui n’a commis aucune infraction, a 0 % de déduction. Ces deux entrepreneurs forment une coentreprise à parts égales (50/50) et envoient une soumission en réponse à une DQ avant la date limite du 28 février 2017. Une déduction de 0,875 % s’appliquera automatiquement au total des points qui seront attribué à leur soumission selon la section Capacité et expérience du membre de l’équipe de construction de la DQ, au terme des évaluations individuelles et collectives.
|